2024-06-01 99 Mellitah Oil and Gas Company assigns Abuab Al-Khair Company to prepare the drilling site for well A64.
2023-12-18 37 Opening a path with a width of 24 meters, and excavation, backfilling, and final leveling works in the Wafa field